|
Truss Assembling
1. Chords
|
3. Module
|
2. Set the diagonals
|
4. Truss
|
Structural Module Assemblig
Before erection, a pair of trusses is connected by braces creating a structural module.
Erection
Structural module erection speed is up to 3.000 square meter per day.
Connecting the modules
After erection, a structural module is connected to another one also using braces.
Unwounding Roll-on coils
Continuous Roll-on coils are unwounded creating channels running the whole length of the roof.
Minimum slope of 1%.
|